Project Description

We recently had the pleasure of working in Beeston on one of the first Arc Cinemas to be built using their new design concept.

Initially, we conducted full site surveys in order to produce complete manufacturing drawings and facilitate bringing the client’s vision to a reality.

We manufactured the Concession Counters using solid surface counter tops with concrete panelling to the front which were inlaid with colour LEDs.
To maintain a feel of continuity around the atrium we also used the same concrete panelling and LED combination as part of the 7m high walls which sat above bespoke black laminated wall panels manufactured at our base in Nelson, Lancashire.

Working alongside a structural engineer, we constructed an elaborate 6m x 3m ceiling raft to a specific design in such a way to ensure the raft was safe to be hung 5m above the floor.

We also had the pleasure of manufacturing:
• The ATM walls
• The Welcome Wall
• The Pick & Mix Stand and unitary
• The various Drinks Stations
• All Fire Doors and casings

The new design concept demanded an extremely high quality to the look and feel of materials and set high expectations, so it was great to hear the clients were highly impressed with the completed installation